Sets the file path of the indicated calibration file needed to hybridize for the indicated port or port-pair on the indicated channel. Outputs the file path of the calibration file needed to hybridize for the indicated port or port-pair on the indicated channel.
Begins a Hybrid FULL4 port calibration using four FULL1 calibrations on all ports and the channel indicated. No query. To query the state of this command use:
The command adds one or more Transmission Throughs (Thrus) to the Hybrid Calibration process on the indicated channel where:
• THRu12 or THR12 = Sets the through line between Port 1 and Port 2.
• THRu13 or THR13 = Sets the through line between Port 1 and Port 3.
• THRu14 or THR14 = Sets the through line between Port 1 and Port 4.
• THRu23 or THR23 = Sets the through line between Port 2 and Port 3.
• THRu24 or THR24 = Sets the through line between Port 2 and Port 4.
• THRu34 or THR34 = Sets the through line between Port 3 and Port 4.
The use of THRus connected to Port 3 and/or Port 4 require a 4-port VNA instrument. At least one THRu must be defined. Up to 6 THRus can be defined. The query outputs the Hybrid calibration process list of Transmission Thrus on the indicated channel.
Begins a Hybrid FULL2 calibration using two FULL1 calibrations on the indicated port pair and channel. No query. To query the state of this command use:
There are six possible FULL2 port-pair combinations available on a 4-port VNA instrument:
• 12 = Port Pair 1-2
• 13 = Port Pair 1-3
• 14 = Port Pair 1-4
• 23 = Port Pair 2-3
• 24 = Port Pair 2-4
• 34 = Port Pair 3-4.
Prepare for this command by specifying the Full2 calibration file name for each port. For example, if Port Pair 2-4 is to be calibrated on channel 3, issue the two commands as:
Begins a Hybrid FULL3 calibration using three FULL1 calibrations on the triport and channel indicated. No query. To query the state of this command use:
There are four possible FULL3 port triplet variations available on a 4-Port Test Set:
• 123 = Port Triplet 1-2-3
• 124 = Port Triplet 1-2-4
• 134 = Port Triplet 1-3-4
• 234 = Port Triplet 2-3-4.
Prepare for this command by specifying the Full1 (Full One) calibration file name for each port. For example, if port triplet 123 is to be calibrated on Channel 4, issue the three commands as:
Use FILe1 for the first number in the port triplet set, use FILe2 for the second number in the port triplet set, and FILe3 for the third number in the port triplet set.
Begins a Hybrid FULL4 calibration using two FULL2 calibrations on the port pair and channel indicated. No query. To query the state of this command use:
There are six possible FULL2 port pair combinations available on a 4-Port Test Set:
• 12 = Port Pair 1-2
• 13 = Port Pair 1-3
• 14 = Port Pair 1-4
• 23 = Port Pair 2-3
• 24 = Port Pair 24
• 34 = Port Pair 3-4
Prepare for this command by specifying the Full2 calibration file name for each port. For example, if Ports 1-3 and Ports 2-4 are to be calibrated on Channel 1, issue the two commands as:
Initiates collection of the through standard data for the Hybrid Calibration on the indicated port pair and channel. No query. There are six possible port pair combinations: